Company portfolio
A. K. Serov Metallurgical Plant OJSC

About the project
A DSP-80 electric arc furnace and a ladle furnace with a liquid steel capacity of 700,000 tonnes per year were built, together with a twin-chamber vacuum degasser. Vacuum oxygen degassing installations with gas cleaning were provided in the electric steelmaking shop.
Project photographs
1Description and photographs from the institute’s materials.



