Privacy policy

Cookies keep the site working. Metrica and maps require your consent.

Customize
Essential — always on

Session, security, interface preferences and your privacy choices, saved for 180 days.

Consent to selected services

By choosing “Allow all” or saving enabled services, I consent to JSC Uralgipromez (60a Lenina Avenue, Yekaterinburg, 620062, Russia) automatically collecting, recording, storing, using and sharing the data described above with YANDEX LLC for visit statistics and/or map display, only as selected. Consent lasts 180 days or until withdrawn via “Cookie settings” in the footer. Declining does not restrict access to core content and contact details. Data enquiries: info@uralgipromez.ru.

Data processing policy (RU)Yandex privacy policy

Your browser cannot save your choices. They will apply only to this page.

Размер шрифта
Цвет фона и шрифта
Изображения
Озвучивание текста
Обычная версия сайта
Skip to content
URALGIPROMEZEngineering Institute
RU EN 中文
Expertise Projects About us Careers Contacts Discuss a project ↗
Home/Projects/Industrial projects

Company portfolio

Chelyabinsk Electrometallurgical Plant OJSC

About the project ↓Project photographs 7 ↓Ask about this project ↗
Chelyabinsk Electrometallurgical Plant OJSC
Category
Industrial projects
Engineering institute
URALGIPROMEZ JSC

Related expertise

Ferroalloy production ↗

About the project

In 2008–2009, a dust-removal system was designed for submerged arc furnaces Nos. 45, 46, 47 and 48, type RKO-27.6, in Smelting Shop No. 7 at Chelyabinsk Electrometallurgical Plant (ferrosilicon production); it was built in 2010. A positive Glavgosexpertiza review was obtained in March 2010. The gas-cleaning equipment was supplied as a complete package by W. L. Gore & Associates. Capacity: 291,000 Nm³/h per furnace. Inlet dust concentration: 1.546 g/Nm³; outlet concentration: no more than 0.02 g/Nm³. Inlet gas temperature: 380 °C. Dust particle size distribution: 50 μm — 31%; 17.5 μm — 3%; 12.5 μm — 3%; 8 μm — 2%; 4.25 μm — 4%; 1.875 μm — 4%; 1.125 μm — 3%; 0.815 μm — 5%; 0.315 μm — 45%. Dust composition: CaO — 1.34%; FeO — 26.9%; MgO — 0.7%; Al2O3 — 2.26%; SiO2 — 49.5%; K2O — 0.28%; Na2O — 0.07%; C — 18.8%; S — 0.15%. Gas composition: O2 — 21.5%; CO2 — 0.5%; N2 — 78%.

Gas-cleaning system components:

  • gas ducts with an internal diameter of 3 m;
  • cyclone battery (first cleaning stage);
  • trombone-type coolers for the dust-laden gas mixture;
  • bag filter block (second cleaning stage);
  • induced-draught fans;
  • stack 6.8 m in diameter and 80 m high.

Project photographs

7
Project photographs 101 ↗Project photographs 202 ↗Project photographs 303 ↗Project photographs 404 ↗Project photographs 505 ↗Project photographs 606 ↗Project photographs 707 ↗

Description and photographs from the institute’s materials.

More projects

Back to the portfolio ↗
Seversky Tube Works PJSCView project ↗
Industrial projects

Seversky Tube Works PJSC

↗
Pervouralsk New Pipe Plant OJSCView project ↗
Industrial projects

Pervouralsk New Pipe Plant OJSC

↗
Amurmetal OJSCView project ↗
Industrial projects

Amurmetal OJSC

↗

From a brief to a project

What are you planning
to create?

A new plant, reconstruction of an existing facility
or an urban infrastructure project —
let’s discuss your brief.

Tell us about your project ↗

Contact us

info@uralgipromez.ru↗ +7 (343) 227-07-01ext. 100
Institute address

60a Lenina Avenue, Yekaterinburg 620062, Russia

Office hours

Mon–Fri: 09:00–18:00 (Yekaterinburg, UTC+5)

All contacts and directions →
URALGIPROMEZEngineering Institute

Ural engineering tradition.
Designing since 1925.

Back to top ↑

Projects and expertise

Project catalogueExpertiseProject locationsContacts

About us

About usHistoryLeadershipPublicationsNewsCareers

Documents

Approvals and certificatesAwards and recognitionShareholders & investorsCompany detailsPublic consultationsExpert reviews
© 2026 URALGIPROMEZ JSCPrivacy policy RU
Home Projects Expertise Contacts
Главная Услуги Объекты Компания Новости Контакты